title: MISSE 7 RETRIEVE
duration: 00:60
steps:
# Skip the "planned PET" part
- simo:
# FYI, "inhibits" basically mean "make sure stuff is turned off before we
# try to unplug it".
IV:
- step: Verify inhibits in place
substeps:
- step: '{{CHECKMARK}} Stbd SARJ locked'
- step: '{{CHECKMARK}} MISSE/ELC-2 inhibits'
# This is a simo block that also includes merged columns. Complicated...
- simo:
EV1:
- warning: Do not touch the hinged side while closing the MISSE PECs (Pinch Point)
- caution:
- Avoid inadverntent contat with the deployed MISSE PECs, which have shatterable materials, and the silver avionics boxes atop the ExPA
- There isn't a second caution in this block, but I wanted to add one here to show that there could be (also for "warning" and "note" blocks).
EV2:
- warning: Do not touch the hinged side while closing the MISSE PECs (Pinch Point)
- caution:
- Avoid inadverntent contat with the deployed MISSE PECs, which have shatterable materials, and the silver avionics boxes atop the ExPA
- There isn't a second caution in this block, but I wanted to add one here to show that there could be (also for "warning" and "note" blocks).
# FIXME: There's an image here that I need to think about how to include
- simo:
EV1:
- step: Translate to S1 Face 2, zenith route
checkboxes:
- Fairlead on S0 HR 3467 (bay 1)
# In 2018 the "GREEN" below would be green-colored text
- step: Attach '''GREEN''' hook on S1 HR 3208 (bay 17)
checkboxes:
- '{{CHECKMARK}} Gate closed, hook locked, reels unlocked, release RET'
- step: Translate zenith to ELC-2
checkboxes:
- Fairlead on S3 HR 3052 (face 1)
# there's an icon for a camera here. Not required for now.
- step: Photograph deployed PECs
substeps:
- step: 'PEC 7B ({{CHECKMARK}} Ram/Fwd side, {{CHECKMARK}} Aft side)'
- step: 'PEC 7A ({{CHECKMARK}} Zenith side, {{CHECKMARK}} Nadir side)'
- step: '{{CHECKMARK}}{{CHECKMARK}} Overall View (2 angles)'
EV2:
- step: Translate to S1 Face 6, nadir route
- step: Attach '''GREEN''' hook on S1 HR 3217 or Xo 5790 (bay 17)
checkboxes:
- Gate closed, hook locked, reels unlocked, release RET
- step: Translate outbd to bay 19
- step: Stow CETA ORU bag on S3 HRs 3046, 3038
- step: Translate zenith to ELC2
- EV2:
- step: If EV1 complete with photos of PEC 7B, close PEC 7B
checkboxes:
- All 4 PIP pins are re-installed
- step: Disconnect connector from PEC 7B
checkboxes:
- RET, remove cap from dummy connector J7B
- Demate connector from PEC
- 'Mate connector to dummy connector J7B ({{CHECKMARK}} no FOD, pins)'
- Install cap onto PEC 7B
- simo:
EV1:
- step: Close PEC 7A
checkboxes:
- '{{CHECKMARK}} All 4 PIP pins are re-installed'
EV2:
- step: Disconnect connector from PEC 7A
checkboxes:
- RET, remove cap from dummy connector J7A
- Demate connector from PEC
- 'Mate connector to dummy connector J7A ({{CHECKMARK}} no FOD, pins)'
- Install cap onto PEC 7A
# Here I haven't put a "step" under EV2, but there is the "checkboxes". If
# this needs to be changed to the following, that's fine:
# - EV2:
# - step: Text of the step...
# checkboxes:
# - Text of the checkbox
- EV2:
- step: 'Release PEC 7B (2 PIP pins), stow on BRT w/RET (nadir HR)'
checkboxes: Reinstall Socket PIP pins (2)
- step:
- 'Release PEC 7A (release 2 PIP pins), stow on BRT w/RET (RAM HR)'
checkboxes:
- Reinstall Socket PIP pins (2)
- simo:
EV1:
- caution: When translating around fwd edge of Node 2 and PMA2, avoid contact with Shuttle
EV2:
- caution: When translating around fwd edge of Node 2 and PMA2, avoid contact with Shuttle
# FIXME: Need to insert an image here.
- simo:
EV1:
- step: Retrieve GREEN hook from S1 HR 3208
checkboxes: Gate closed, hook locked, reels unlocked, release RET
- step: Translate to Node 2, along port/zenith
- step: Attach GREEN hook on Node 2 HR 0344
checkboxes: Gate closed, hook locked, reels unlocked, release RET
title: STOW MISSE 7A IN PLB (00:10)
- step: Translate to Orbiter, port, bay 4
- step: Remove SWC latch PIP pins (2)
- step: Release latch (2) from stow position
- step: Stow PEC 7A in carrier (HRs out, Probe up)
- step: Lock fwd latch in landing config
checkboxes: Install PIP pin
- step: Retrieve RET
- step: Lock aft latch in landing config
checkboxes: Install PIP pin
EV2:
- step: Retrieve GREEN hook from S1 HR 3217 or Xo 5790
checkboxes: Gate closed, hook locked, reels unlocked, release RET
- step: Translate to Node 2, stbd/zenith route
checkboxes:
- Fairlead on Lab HR 0247 with wrist Adj
- Fairlead on Node 2 HR 0314
- Face toward Col and Node 2
- warning: Stay 2 ft from exposed EFGF connector when OBSS berthed, powered, and EFGF not grappled
# It'd be better if there was a way to tie this time into the overall
# time for the whole task, so it wasn't possible to make sub-headings
# have times that don't add up to the whole task's time.
title: STOW MISSE 7B IN PLB (00:15)
- step: Translate to Orbiter, stbd, bay 4
- step: Remove SWC latch PIP pins (2)
- step: Release latch (2) from stow position
- step: Stow PEC 7B in carrier (HRs out, Probe up)
- step: Lock aft latch in landing config
checkboxes: Install PIP pin
- step: Retrieve RET
- step: Lock fwd latch in landing config
checkboxes: Install PIP pin
- simo:
EV1:
- step: Glove and Gauntlet check
- step: Translate aft to Bay 9 - MISSE 8 Retrieve
EV2:
# Making changes to test the <strong> conversion with wiki or md
- step: '**Glove and Gauntlet check**'
- step: "'''Translate aft to S3 Face 1 - S3 CETA Light Install'''"