Procedure generator for on space operations

156 lines (139 loc) 6.69 kB
title: MISSE 7 RETRIEVE duration: 00:60 steps: # Skip the "planned PET" part - simo: # FYI, "inhibits" basically mean "make sure stuff is turned off before we # try to unplug it". IV: - step: Verify inhibits in place substeps: - step: '{{CHECKMARK}} Stbd SARJ locked' - step: '{{CHECKMARK}} MISSE/ELC-2 inhibits' # This is a simo block that also includes merged columns. Complicated... - simo: EV1: - warning: Do not touch the hinged side while closing the MISSE PECs (Pinch Point) - caution: - Avoid inadverntent contat with the deployed MISSE PECs, which have shatterable materials, and the silver avionics boxes atop the ExPA - There isn't a second caution in this block, but I wanted to add one here to show that there could be (also for "warning" and "note" blocks). EV2: - warning: Do not touch the hinged side while closing the MISSE PECs (Pinch Point) - caution: - Avoid inadverntent contat with the deployed MISSE PECs, which have shatterable materials, and the silver avionics boxes atop the ExPA - There isn't a second caution in this block, but I wanted to add one here to show that there could be (also for "warning" and "note" blocks). # FIXME: There's an image here that I need to think about how to include - simo: EV1: - step: Translate to S1 Face 2, zenith route checkboxes: - Fairlead on S0 HR 3467 (bay 1) # In 2018 the "GREEN" below would be green-colored text - step: Attach '''GREEN''' hook on S1 HR 3208 (bay 17) checkboxes: - '{{CHECKMARK}} Gate closed, hook locked, reels unlocked, release RET' - step: Translate zenith to ELC-2 checkboxes: - Fairlead on S3 HR 3052 (face 1) # there's an icon for a camera here. Not required for now. - step: Photograph deployed PECs substeps: - step: 'PEC 7B ({{CHECKMARK}} Ram/Fwd side, {{CHECKMARK}} Aft side)' - step: 'PEC 7A ({{CHECKMARK}} Zenith side, {{CHECKMARK}} Nadir side)' - step: '{{CHECKMARK}}{{CHECKMARK}} Overall View (2 angles)' EV2: - step: Translate to S1 Face 6, nadir route - step: Attach '''GREEN''' hook on S1 HR 3217 or Xo 5790 (bay 17) checkboxes: - Gate closed, hook locked, reels unlocked, release RET - step: Translate outbd to bay 19 - step: Stow CETA ORU bag on S3 HRs 3046, 3038 - step: Translate zenith to ELC2 - EV2: - step: If EV1 complete with photos of PEC 7B, close PEC 7B checkboxes: - All 4 PIP pins are re-installed - step: Disconnect connector from PEC 7B checkboxes: - RET, remove cap from dummy connector J7B - Demate connector from PEC - 'Mate connector to dummy connector J7B ({{CHECKMARK}} no FOD, pins)' - Install cap onto PEC 7B - simo: EV1: - step: Close PEC 7A checkboxes: - '{{CHECKMARK}} All 4 PIP pins are re-installed' EV2: - step: Disconnect connector from PEC 7A checkboxes: - RET, remove cap from dummy connector J7A - Demate connector from PEC - 'Mate connector to dummy connector J7A ({{CHECKMARK}} no FOD, pins)' - Install cap onto PEC 7A # Here I haven't put a "step" under EV2, but there is the "checkboxes". If # this needs to be changed to the following, that's fine: # - EV2: # - step: Text of the step... # checkboxes: # - Text of the checkbox - EV2: - step: 'Release PEC 7B (2 PIP pins), stow on BRT w/RET (nadir HR)' checkboxes: Reinstall Socket PIP pins (2) - step: - 'Release PEC 7A (release 2 PIP pins), stow on BRT w/RET (RAM HR)' checkboxes: - Reinstall Socket PIP pins (2) - simo: EV1: - caution: When translating around fwd edge of Node 2 and PMA2, avoid contact with Shuttle EV2: - caution: When translating around fwd edge of Node 2 and PMA2, avoid contact with Shuttle # FIXME: Need to insert an image here. - simo: EV1: - step: Retrieve GREEN hook from S1 HR 3208 checkboxes: Gate closed, hook locked, reels unlocked, release RET - step: Translate to Node 2, along port/zenith - step: Attach GREEN hook on Node 2 HR 0344 checkboxes: Gate closed, hook locked, reels unlocked, release RET title: STOW MISSE 7A IN PLB (00:10) - step: Translate to Orbiter, port, bay 4 - step: Remove SWC latch PIP pins (2) - step: Release latch (2) from stow position - step: Stow PEC 7A in carrier (HRs out, Probe up) - step: Lock fwd latch in landing config checkboxes: Install PIP pin - step: Retrieve RET - step: Lock aft latch in landing config checkboxes: Install PIP pin EV2: - step: Retrieve GREEN hook from S1 HR 3217 or Xo 5790 checkboxes: Gate closed, hook locked, reels unlocked, release RET - step: Translate to Node 2, stbd/zenith route checkboxes: - Fairlead on Lab HR 0247 with wrist Adj - Fairlead on Node 2 HR 0314 - Face toward Col and Node 2 - warning: Stay 2 ft from exposed EFGF connector when OBSS berthed, powered, and EFGF not grappled # It'd be better if there was a way to tie this time into the overall # time for the whole task, so it wasn't possible to make sub-headings # have times that don't add up to the whole task's time. title: STOW MISSE 7B IN PLB (00:15) - step: Translate to Orbiter, stbd, bay 4 - step: Remove SWC latch PIP pins (2) - step: Release latch (2) from stow position - step: Stow PEC 7B in carrier (HRs out, Probe up) - step: Lock aft latch in landing config checkboxes: Install PIP pin - step: Retrieve RET - step: Lock fwd latch in landing config checkboxes: Install PIP pin - simo: EV1: - step: Glove and Gauntlet check - step: Translate aft to Bay 9 - MISSE 8 Retrieve EV2: # Making changes to test the <strong> conversion with wiki or md - step: '**Glove and Gauntlet check**' - step: "'''Translate aft to S3 Face 1 - S3 CETA Light Install'''"