UNPKG

xops-pat

Version:

Procedure generator for on space operations

156 lines (144 loc) 6.25 kB
title: EGRESS/SETUP duration: 00:25 steps: # First steps in IV column (first column) - simo: IV: - step: Record PET start time ____:____ (Pwr to Batt) - step: Start WVS Recorders images: ./WVSRecorders.png EV1: - step: '{{CHECK}} All gates closed & hooks locked' title: '**Initial Configuration**' checkboxes: - '{{CHECKMARK}} R Waist Tether to EV2 Blank hook' - '{{CHECKMARK}} Red hook on L D-ring ext' - '{{CHECKMARK}} Yellow hook on Green ERCM' - '{{CHECKMARK}} Green hook on Red ERCM' - '{{CHECKMARK}} Blank hook on MWS' EV2: - step: '{{CHECK}} All gates closed & hooks locked' title: '*Initial Configuration*' checkboxes: - '{{CHECKMARK}} All gates closed & hooks locked' - '{{CHECKMARK}} R Waist Tether to A/L D-ring ext' - '{{CHECKMARK}} Red hook on L D-ring ext' - '{{CHECKMARK}} Yellow hook on Green ERCM' - '{{CHECKMARK}} Green hook on Red ERCM' - '{{CHECKMARK}} Blank hook to EV1 R Waist Tether' # FIXME: How to handle "EGRESS/SETUP" header after initial configuration. # EV1's step "open thermal cover" should really drive the IV's step to start a # clock. The steps below show the YAML equivalent to the STS-134 procedure. - simo: EV1: - step: Open hatch thermal cover title: EGRESS/SETUP (00:25) - step: Egress A/L IV: 'Start Hatch thermal cover clock PET (30 min) ____:____' # # The next step is an ALTERNATE to the EV1 and IV steps above that merges # # these into a single block (since one drives the other). # -simo: # - IV + EV1: # - step: 'EV1 open thermal cover. IV start clock (30 min) ____:____' # And here's another alternate. This would indicate that one step has a step # in another column that must follow it. # - EV1: Open hatch thermal cover # causes: # - IV: 'Start Hatch Thermal Cover clock PET (30 min) ____:____' # # # End of alternate methods # # # - simo: EV1: - step: Receive EWC ORU bag from EV3, stow on BRT w/RET EV2: - step: Transfer EWC ORU Bag to EV1 checkboxes: - Position CETA ORU bag near hatch EV2: Egress A/L # FIXME: Perhaps this should be a "simo" block. Two essentially identical sets # of steps, one in each column, performed at the same time. How to # visually indicate "simo" in the display format (not in YAML)? - simo: EV2: - step: Perform buddy checks checkboxes: - MWS tabs up - BRT tab up - tether configs - step: Verify SAFER config checkboxes: - '{{CHECKMARK}}L handle down (MAN ISOL Vlv - Open)' - '{{CHECKMARK}}R handle down (HCM - Closed)' - step: '{{CHECKMARK}}WVS - Green LED' IV: - step: 'Post crew egress, WVS Software:' substeps: - step: select page - RF camera. - step: Sel 'Advanced Controls' # I'm not sure about the indenting on this one in the real procedure. We # don't do all these steps anymore. - step: S-Band Level (two) - Max - simo: EV1: - step: Perform buddy checks checkboxes: - MWS tabs up - BRT tab up - tether configs - step: Verify SAFER config checkboxes: - '{{CHECKMARK}}L handle down (MAN ISOL Vlv - Open)' - '{{CHECKMARK}}R handle down (HCM - Closed)' - step: '{{CHECKMARK}}WVS - Green LED' # EV2's steps are a copy/paste of EV1. EV2: - step: Perform buddy checks checkboxes: - MWS tabs up - BRT tab up - tether configs - step: Verify SAFER config checkboxes: - '{{CHECKMARK}}L handle down (MAN ISOL Vlv - Open)' - '{{CHECKMARK}}R handle down (HCM - Closed)' - step: '{{CHECKMARK}}WVS - Green LED' # MediaWiki formatter in place later. - simo: EV1: - step: Translate to S0 Port Struts - step: Attach EV1 **BLANK** hook to port-outboard strut checkboxes: - '{{CHECKMARK}} Gat closed, hook locked, reels unlocked, release RET' - step: Attach EV2 **BLANK** hook to port-inboard strut checkboxes: - '{{CHECKMARK}} Gate closed, hook locked' - step: Release EV1 R Waist Tether from EV2 **BLANK** hook EV2: - step: Retrieve CETA ORU bag, stow on BRT with RET # This corresponds to page 7-20, EV1 step 12 and EV2 step 8. I've re-written # it to be one step in a shared (merged) column. - simo: EV1: - step: Give **EV3 GO** to release Waist Tether EV2: - step: On **EV1 GO**, EV2 release right Waist Tether from Airlock internal D-Ring - simo: EV1: - step: Translate forward along Lab. # "HR" means "handrail". At some point in the future it may be cool to use # some sort of template here like: "on Lab HR {{HR|0260}}, {{HR|0259}} ..." # that allows us to generate links to our CAD/VR model of the space station. # This way people who are reading along and thinking "where is HR 0260" can # just click a link and see in the model (assuming they're viewing in an # HTML, not printed, version). - step: Stow EWC ORU bag on Lab HR 0260, 0259 with hinge ISS aft - step: Translate to S1 Face 1, zenith - MISSE 7 Retrieve EV2: - step: Close hatch thermal cover # best here would be to add IV's step using "causes". # causes: # - IV: "Stop Hatch Thermal Cover clock PET (30 min) ____:____" - step: Perform translation adaptation - step: Translate to S1 Face 1, nadir - MISSE 7 Retrieve # If not able to do the "causes" block above, do this: - IV: - step: 'Stop Hatch Thermal Cover clock PET (30 min) ____:____'