# Deployment Plan Template ## Purpose Describe how the solution will be deployed, verified, and supported in target environments during the Transition phase. ## Ownership & Collaboration - Document Owner: Deployment Manager - Contributor Roles: Integrator, Configuration Manager, Test Architect - Automation Inputs: Release candidate designation, environment matrix, rollout constraints - Automation Outputs: `deployment-plan.md` covering sections 1–12 ## Completion Checklist - Deployment steps sequenced with owners and timing - Environment prerequisites, data migration, and rollback strategies defined - Verification activities and success metrics established ## Document Sections 1. **Introduction** - Purpose, scope, release identifiers, and references. 2. **Deployments Table (12-Factor I — One Codebase, Many Deploys)** - Enumerate every environment the codebase targets. One row per deployed environment. Columns: environment name, purpose, URL (if applicable), deployed artifact (image tag pattern), scaling profile, owner. - The table makes explicit what 12-factor calls "many deploys from one codebase." If rows differ in more than environment name and scale, flag the divergence — same codebase should mean structurally equivalent deployments. 3. **Deployment Strategy** - Deployment model (big bang, phased, blue/green, canary) and rationale. 4. **Environments and Prerequisites** - List target environments, configurations, access requirements, and readiness checks. 5. **Rolling Restart Strategy (12-Factor IX — Disposability)** - Grace period for SIGTERM before SIGKILL (typical: 30s for web, 60s for workers). - Load balancer readiness probe grace (connection draining window). - Per-process-type restart concurrency (`maxUnavailable`, `maxSurge` for k8s). - Verification that startup time measurement passes the < 10s NFR from the SAD. 6. **Deployment Schedule** - Timeline with milestones, freeze periods, and communication checkpoints. 7. **Deployment Steps** - Detailed step-by-step procedure with responsible parties and expected duration. 8. **Admin Tasks for This Release (12-Factor XII — Admin Processes)** - List every admin task required for this release (migrations, backfills, key rotations). Reference `templates/deployment/admin-processes-template.md`. - For each task: ADM-ID, category, ordering (pre-deploy / during / post-deploy), approval status, rollback procedure. - Ad-hoc scripts or manual data fixes are NOT permitted — everything traces to a documented ADM-XXX entry. 9. **Data Migration Plan** - Describe data preparation, migration scripts, validation, and backout steps. 10. **Verification and Validation** - Outline smoke tests, health checks, and monitoring to confirm success. 11. **Rollback and Contingency** - Provide rollback triggers, procedures, and decision authorities. 12. **Communication Plan** - Define stakeholder notifications before, during, and after deployment. 13. **Support Handover** - Document training, documentation, SLAs, and on-call rotation updates. 14. **Risk Management** - Identify deployment risks and mitigation/responsible owners. 15. **Approvals** - Capture sign-offs required before proceeding. ## Agent Notes - Use tables for steps, linking to scripts or playbooks stored in the repo or external automation. - Coordinate with Release Notes, Product Acceptance Plan, and Support Runbook for consistency. - Update the plan after each rehearsal or dry run to reflect lessons learned. - Verify the Automation Outputs entry is satisfied before signaling completion.