Cognitive architecture for AI-augmented software development with structured memory, ensemble validation, and closed-loop correction. FAIR-aligned artifacts, 84% cost reduction via human-in-the-loop, standards adopted by 100+ organizations.

1,186 lines (939 loc) 40.8 kB
--- description: Orchestrate continuous risk identification, assessment, tracking, and retirement across SDLC phases category: sdlc-orchestration argument-hint: [project-directory] [--iteration N] [--guidance "text"] [--interactive] allowed-tools: Task, Read, Write, Glob, TodoWrite orchestration: true model: opus --- # Risk Management Cycle Orchestration Flow **You are the Core Orchestrator** for continuous risk management throughout the SDLC. ## Your Role **You orchestrate multi-agent workflows. You do NOT execute bash scripts.** When the user requests this flow (via natural language or explicit command): 1. **Interpret the request** and confirm understanding 2. **Read this template** as your orchestration guide 3. **Extract agent assignments** and workflow steps 4. **Launch agents via Task tool** in correct sequence 5. **Synthesize results** and finalize artifacts 6. **Report completion** with summary ## Risk Management Overview **Purpose**: Maintain continuous visibility into project risks, proactively retire technical and business risks before they become blockers, and ensure the team operates with acceptable risk tolerance throughout all SDLC phases. **Key Activities**: - Risk identification (business, technical, security) - Risk assessment (probability × impact scoring) - Risk mitigation planning (spikes, POCs) - Risk tracking and monitoring - Risk retirement validation **Expected Duration**: 90-minute workshop + 2-5 days for spikes, 10-15 minutes orchestration ## Natural Language Triggers Users may say: - "Update risks" - "Review risks" - "Manage risks" - "Risk assessment" - "Identify new risks" - "Conduct risk workshop" - "Retire risks" You recognize these as requests for this orchestration flow. ## Parameter Handling ### --guidance Parameter **Purpose**: User provides upfront direction to tailor risk management priorities **Examples**: ``` --guidance "Focus on security risks, compliance audit in 3 months" --guidance "Performance risks are critical, need sub-100ms p95 validation" --guidance "Tight timeline, prioritize Show Stopper risks only" --guidance "Team lacks DevOps experience, infrastructure risks need extra attention" ``` **How to Apply**: - Parse guidance for keywords: security, performance, compliance, timeline, team skills - Adjust agent assignments (add security-architect, privacy-officer for compliance focus) - Modify risk assessment depth (comprehensive vs. focused on specific categories) - Influence spike/POC scope (minimal vs. comprehensive validation) ### --interactive Parameter **Purpose**: You ask 6 strategic questions to understand risk context **Questions to Ask** (if --interactive): ``` I'll ask 6 strategic questions to tailor risk management to your project's needs: Q1: What are your top priorities for this risk cycle? (e.g., security validation, performance proof, compliance readiness) Q2: What are your biggest constraints? (e.g., tight timeline, limited budget, small team) Q3: What risks concern you most for this workflow? (e.g., technical unknowns, third-party dependencies, regulatory changes) Q4: What's your team's experience level with this type of activity? (Helps me gauge risk assessment calibration and spike scope) Q5: What's your target timeline? (Influences spike duration and mitigation planning depth) Q6: Are there compliance or regulatory requirements? (e.g., HIPAA, SOC2, PCI-DSS - affects security/privacy risk focus) Based on your answers, I'll adjust: - Agent assignments (add specialized risk assessors) - Risk category focus (security-first vs. performance-first) - Spike/POC scope (minimal vs. comprehensive) - Workshop agenda emphasis (technical vs. business vs. operational) ``` **Synthesize Guidance**: Combine answers into structured guidance string for execution ### --iteration Parameter **Purpose**: Track risk cycles per iteration (bi-weekly or per sprint) **Usage**: `--iteration 3` (Elaboration Iteration 3) or `--iteration Construction-5` (Construction Iteration 5) ## Risk Management Philosophy **Proactive Risk Management**: - Risks are identified early, tracked continuously, and retired systematically - High-risk assumptions are validated via spikes/POCs before committing resources - Show Stopper risks are escalated immediately and require executive decision - Risk retirement is a primary objective of Elaboration phase (70%+ retired by ABM) **Risk Categorization**: - **Show Stopper (P0)**: Project cannot proceed without resolution (score 21-25) - **High (P1)**: Major impact to schedule, scope, or quality (score 16-20) - **Medium (P2)**: Moderate impact, workarounds available (score 11-15) - **Low (P3)**: Minor impact, can be deferred (score 1-10) ## Artifacts to Generate **Primary Deliverables**: - **Risk Identification Workshop Notes**: New risks and status updates `.aiwg/risks/risk-workshop-{date}.md` - **Risk Assessment Report**: Prioritized risk list with scoring `.aiwg/risks/risk-assessment-{date}.md` - **Updated Risk List**: Current status of all risks `.aiwg/risks/risk-list.md` - **Spike Results**: POC findings for high-priority risks `.aiwg/risks/spike-{risk-id}-results.md` - **Risk Retirement Report**: Validation evidence and metrics `.aiwg/risks/risk-retirement-report.md` - **Risk Escalation Briefs**: Show Stopper risk decisions `.aiwg/risks/risk-escalation-{risk-id}.md` - **Risk Status Report**: Stakeholder summary `.aiwg/risks/risk-status-report-{date}.md` **Supporting Artifacts**: - Risk validation documents (analysis-based retirements) - POC code and benchmarks (working directory) - Complete audit trails (archived workflows) ## Multi-Agent Orchestration Workflow ### Step 1: Conduct Risk Identification Workshop **Purpose**: Facilitate regular risk identification session with project team **Your Actions**: 1. **Check Workshop Frequency**: ``` Read current project phase from .aiwg/intake/project-intake.md or .aiwg/planning/phase-plan-*.md Workshop frequency by phase: - Inception: Weekly (rapid discovery of unknowns) - Elaboration: Bi-weekly (validate architectural risks) - Construction: Bi-weekly per iteration (identify delivery risks) - Transition: Weekly (production readiness risks) ``` 2. **Load Current Context**: ``` Read: - .aiwg/risks/risk-list.md (current risk status) - .aiwg/intake/project-intake.md (project scope and constraints) - Recent changes (if accessible via git log or documentation) ``` 3. **Launch Workshop Facilitation Agents** (parallel): ``` # Agent 1: Project Manager (Workshop Facilitator) Task( subagent_type="project-manager", description="Facilitate risk identification workshop", prompt=""" Read current risk list: .aiwg/risks/risk-list.md Facilitate 90-minute risk identification workshop: Agenda: 1. Review Previous Risks (15 min) - Status update on existing risks - Validate risk retirements - Re-assess probabilities and impacts 2. Identify New Risks (30 min) - Technical risks (architecture, performance, scalability) - Business risks (requirements changes, resource availability) - Security risks (vulnerabilities, compliance) - Operational risks (deployment, monitoring, support) - External risks (third-party dependencies, vendor delays) 3. Prioritize Risks (20 min) - Score probability (1-5): 1=Rare, 5=Almost Certain - Score impact (1-5): 1=Negligible, 5=Catastrophic - Calculate risk score: Probability × Impact (1-25) - Categorize: Show Stopper (21-25), High (16-20), Medium (11-15), Low (1-10) 4. Plan Mitigation Actions (20 min) - Show Stopper: Immediate action plan, executive escalation - High: Spike/POC to validate assumptions (1-3 days) - Medium: Monitoring plan, deferred action - Low: Accept and monitor 5. Assign Ownership (5 min) - Each risk assigned to specific owner - Due dates for spikes and mitigation actions - Re-assessment date scheduled Risk Identification Prompts: - "What technical unknowns remain?" - "What assumptions are we making that could be wrong?" - "What external dependencies could fail?" - "What could prevent us from meeting our schedule?" - "What security vulnerabilities are most likely?" - "What operational challenges do we anticipate?" Document workshop results: - New risks identified (with ID, description, category) - Risk status updates (status changes with rationale) - Action items (owner, due date) Save to: .aiwg/risks/risk-workshop-{date}.md """ ) # Agent 2: Architecture Designer (Technical Risks) Task( subagent_type="architecture-designer", description="Identify architectural and technical risks", prompt=""" Read project architecture: .aiwg/architecture/software-architecture-doc.md (if exists) Read project intake: .aiwg/intake/project-intake.md Identify technical and architectural risks: Technical Risk Categories: - Architecture choices unproven (new framework, database) - Performance requirements unclear (scalability unknowns) - Integration complexity underestimated (third-party APIs) - Technology learning curve steep (team skill gaps) - Data migration complexity (schema evolution, volume) For each risk: - Risk description (clear, specific) - Why it's a risk (impact if materializes) - Initial probability estimate (1-5) - Initial impact estimate (1-5) - Suggested mitigation (spike, POC, architecture change) Save technical risks to: .aiwg/working/risks/technical-risks-draft.md """ ) # Agent 3: Security Architect (Security Risks) Task( subagent_type="security-architect", description="Identify security and compliance risks", prompt=""" Read project intake: .aiwg/intake/project-intake.md Read data classification: .aiwg/security/data-classification.md (if exists) Identify security and compliance risks: Security Risk Categories: - Compliance requirements unclear (GDPR, HIPAA, SOC2) - Vulnerability exposure (third-party dependencies, CVEs) - Authentication/authorization complex (multi-tenant, SSO) - Data breach potential (PII, financial data, encryption gaps) - Audit logging insufficient (compliance requirements) For each risk: - Risk description - Compliance impact (regulatory penalties, audit failures) - Initial probability estimate (1-5) - Initial impact estimate (1-5) - Suggested mitigation (security review, penetration test, compliance audit) Save security risks to: .aiwg/working/risks/security-risks-draft.md """ ) # Agent 4: Business Analyst (Business Risks) Task( subagent_type="business-analyst", description="Identify business and organizational risks", prompt=""" Read project intake: .aiwg/intake/project-intake.md Read business case: .aiwg/planning/business-case-*.md (if exists) Identify business and organizational risks: Business Risk Categories: - Requirements changing frequently (scope creep) - Stakeholder availability limited (approval delays) - Funding uncertain (budget cuts possible) - Competitive pressure (market timing critical) - Team attrition (key personnel leaving) For each risk: - Risk description - Business impact (revenue, market share, reputation) - Initial probability estimate (1-5) - Initial impact estimate (1-5) - Suggested mitigation (stakeholder alignment, scope freeze, contingency plans) Save business risks to: .aiwg/working/risks/business-risks-draft.md """ ) ``` 4. **Synthesize Workshop Results**: ``` Task( subagent_type="risk-manager", description="Synthesize risk identification workshop results", prompt=""" Read all risk identification inputs: - .aiwg/risks/risk-workshop-{date}.md (workshop notes) - .aiwg/working/risks/technical-risks-draft.md - .aiwg/working/risks/security-risks-draft.md - .aiwg/working/risks/business-risks-draft.md Synthesize comprehensive risk identification report: Structure: 1. Workshop Summary - Date, attendees, iteration number - New risks identified (count by category) - Risk status updates (count by status change) 2. New Risks Identified - For each risk: ID, description, category, probability, impact, score, priority, owner, mitigation 3. Risk Status Updates - For each updated risk: ID, previous status, current status, rationale 4. Action Items - Prioritized list with owner and due date Use template: $AIWG_ROOT/agentic/code/frameworks/sdlc-complete/templates/management/risk-list-template.md Save to: .aiwg/risks/risk-workshop-{date}.md (final) """ ) ``` **Communicate Progress**: ``` ✓ Initialized risk identification workshop ⏳ Facilitating risk workshop (90 minutes)... ✓ Project Manager: Workshop facilitation complete ✓ Architecture Designer: {count} technical risks identified ✓ Security Architect: {count} security risks identified ✓ Business Analyst: {count} business risks identified ✓ Risk Identification Workshop complete: .aiwg/risks/risk-workshop-{date}.md - New risks: {count} - Updated risks: {count} - Action items: {count} ``` ### Step 2: Assess and Score Risks **Purpose**: Apply consistent risk assessment methodology to prioritize risks **Your Actions**: 1. **Launch Risk Assessment Agent**: ``` Task( subagent_type="risk-manager", description="Assess and score identified risks", prompt=""" Read workshop results: .aiwg/risks/risk-workshop-{date}.md Read current risk list: .aiwg/risks/risk-list.md Apply risk assessment matrix: Probability Scoring: | Probability | Definition | Score | |-------------|------------|-------| | Rare | <10% chance | 1 | | Unlikely | 10-30% chance | 2 | | Possible | 30-50% chance | 3 | | Likely | 50-70% chance | 4 | | Almost Certain | >70% chance | 5 | Impact Scoring: | Impact | Definition | Score | |--------|------------|-------| | Negligible | <1 day delay, no scope impact | 1 | | Minor | 1-3 days delay, minor scope reduction | 2 | | Moderate | 1-2 weeks delay, moderate scope impact | 3 | | Major | >2 weeks delay, major scope reduction | 4 | | Catastrophic | Project failure or cancellation | 5 | Risk Score Calculation: - Score = Probability × Impact (range: 1-25) - Show Stopper (P0): Score 21-25 (immediate action required) - High (P1): Score 16-20 (spike/POC within 1 week) - Medium (P2): Score 11-15 (monitor, plan mitigation) - Low (P3): Score 1-10 (accept, periodic review) For each risk: - Validate probability and impact scores (calibrate with team consensus) - Calculate risk score - Assign priority category - Document assessment rationale Generate Risk Assessment Report: 1. Risk Summary by Priority (count of P0, P1, P2, P3) 2. Top 5 Risks (by score) 3. Risk Trends (new vs. retired, score trend) 4. Escalations Required (Show Stopper risks) Save to: .aiwg/risks/risk-assessment-{date}.md """ ) ``` **Communicate Progress**: ``` ✓ Workshop synthesis complete ⏳ Assessing and scoring risks... ✓ Risk Assessment complete: .aiwg/risks/risk-assessment-{date}.md - Show Stopper (P0): {count} - High (P1): {count} - Medium (P2): {count} - Low (P3): {count} - Top risk: {risk-id} (score: {score}) ``` ### Step 3: Update Risk List and Tracking **Purpose**: Maintain comprehensive risk list with current status **Your Actions**: 1. **Launch Risk List Update Agent**: ``` Task( subagent_type="risk-manager", description="Update master risk list with assessment results", prompt=""" Read current risk list: .aiwg/risks/risk-list.md Read risk assessment: .aiwg/risks/risk-assessment-{date}.md Read workshop results: .aiwg/risks/risk-workshop-{date}.md Update comprehensive risk list: Structure (use template): - Project metadata (name, last updated, risk owner) - Active Risks (by priority: P0 P1 P2 P3) - Retired Risks (archive section) - Risk Metrics (retirement rate, average score, time to retirement) For each risk: - Risk ID (unique identifier) - Risk Title (concise) - Description (detailed) - Category (Technical | Business | Security | Operational | External) - Assessment (probability, impact, score, priority) - Status (IDENTIFIED | MITIGATED | RETIRED | ACCEPTED) - Owner (name or role) - Mitigation Plan (specific actions) - Contingency Plan (actions if risk materializes) - Target Date (for risk retirement) - Last Updated (timestamp) - Notes (status updates, spike results, decisions) Add traceability links: - Risk-ID Spike-ID (if spike conducted) - Risk-ID ADR-ID (if architectural decision) - Risk-ID UC-ID (if requirement-related) Track risk aging: - Time since identification - Escalate stale risks (no progress in >2 weeks) Template: $AIWG_ROOT/agentic/code/frameworks/sdlc-complete/templates/management/risk-list-template.md Save updated risk list to: .aiwg/risks/risk-list.md """ ) ``` **Communicate Progress**: ``` ✓ Risk assessment complete ⏳ Updating master risk list... ✓ Risk List updated: .aiwg/risks/risk-list.md - Total active risks: {count} - Risks added this cycle: {count} - Risks retired this cycle: {count} - Risk retirement rate: {percentage}% ``` ### Step 4: Execute Spikes and POCs for High-Priority Risks **Purpose**: Conduct time-boxed experiments to validate high-risk assumptions **Your Actions**: 1. **Identify High-Priority Risks Requiring Validation**: ``` Read .aiwg/risks/risk-list.md Filter for: - Priority: P0 (Show Stopper) or P1 (High) - Status: IDENTIFIED (not yet mitigated or retired) - Mitigation: Spike or POC recommended ``` 2. **For Each High-Risk, Launch Spike/POC Agent**: ``` # Determine spike approach based on risk category # Option A: Technical/Performance Spike (architecture-designer + software-implementer) Task( subagent_type="architecture-designer", description="Conduct technical spike for Risk #{risk-id}", prompt=""" Risk to validate: {risk-description} Risk ID: {risk-id} Timebox: 1-3 days (strict) Spike Planning: - Define hypothesis (what assumption are we testing?) - Define success criteria (what validates the hypothesis?) - Define approach (how will we test it?) Spike Execution: - Build minimal prototype (not production code) - Test hypothesis with real data/tools - Document findings (code, screenshots, metrics) - Formulate recommendation Spike Review: - Present findings - Go/No-Go decision on risk - Update risk status (RETIRED | MITIGATED | ESCALATE) - Create ADR if architecture change needed Spike Card Template: $AIWG_ROOT/.../templates/analysis-design/spike-card-template.md Document: - Hypothesis and success criteria - Approach and findings - Result (SUCCESS | FAILURE | PARTIAL) - Recommendation (risk status, follow-up actions) - Traceability (Risk-ID, ADR-ID if applicable) Save spike results to: .aiwg/risks/spike-{risk-id}-results.md """ ) # Option B: Security Spike (security-architect) Task( subagent_type="security-architect", description="Conduct security validation for Risk #{risk-id}", prompt=""" Risk to validate: {risk-description} Risk ID: {risk-id} Security Validation Approach: - Threat modeling (STRIDE analysis) - Vulnerability assessment (dependency scan, OWASP Top 10) - Compliance validation (GDPR, HIPAA, SOC2 requirements) - Penetration testing (if feasible in timebox) Document findings: - Vulnerabilities identified (severity, CVSS score) - Compliance gaps (regulation, requirement, current state) - Mitigation recommendations (controls, architecture changes) - Residual risk (after mitigation) Decision: - Risk status: RETIRED | MITIGATED | ACCEPTED | ESCALATE - Evidence: scan results, test reports, compliance checklist Save to: .aiwg/risks/spike-{risk-id}-results.md """ ) # Option C: POC for Feasibility (software-implementer) Task( subagent_type="software-implementer", description="Build POC for Risk #{risk-id}", prompt=""" Risk to validate: {risk-description} Risk ID: {risk-id} Timebox: 1-3 days Use /build-poc command: /build-poc "{risk-description}" --scope {minimal|standard|comprehensive} POC Objectives: - Demonstrate technical feasibility - Validate performance requirements (if applicable) - Test integration with third-party systems (if applicable) - Prove architecture pattern works (if applicable) Acceptance criteria: {what proves risk is retired} Document POC results: - Approach (what was built, how was it tested) - Results (metrics, observations, screenshots) - Decision: GO (risk retired) | NO-GO (risk remains) | PIVOT (change approach) - Code artifacts (link to POC code, if saved) Save to: .aiwg/risks/poc-{risk-id}-results.md """ ) ``` 3. **Synthesize Spike Execution Summary**: ``` Task( subagent_type="risk-manager", description="Synthesize spike/POC results", prompt=""" Read all spike/POC results: - .aiwg/risks/spike-*-results.md - .aiwg/risks/poc-*-results.md Generate Spike Execution Summary: 1. Spikes Completed - For each: Spike-ID, Risk-ID, owner, duration, result, risk status, ADR created 2. Risk Retirement Impact - Risks retired via spikes (list) - Risks requiring further action (list) 3. Lessons Learned - What worked well (positive outcomes) - What could improve (process improvements) Calculate metrics: - Spikes completed: {count} - Risks retired: {count} - Average spike duration: {days} - Spike success rate: {percentage}% Save to: .aiwg/risks/spike-execution-summary-{date}.md """ ) ``` **Communicate Progress**: ``` ✓ Risk list updated ⏳ Executing spikes/POCs for high-priority risks... ✓ Spike #{risk-id-1}: {title} - SUCCESS → RETIRED ✓ Spike #{risk-id-2}: {title} - PARTIAL → MITIGATED ✓ POC #{risk-id-3}: {title} - SUCCESS → RETIRED ⚠️ Spike #{risk-id-4}: {title} - FAILURE → ESCALATE ✓ Spike Execution complete: .aiwg/risks/spike-execution-summary-{date}.md - Spikes completed: {count} - Risks retired: {count} - Risks escalated: {count} ``` ### Step 5: Validate Risk Retirement **Purpose**: Ensure retired risks are genuinely resolved with evidence **Your Actions**: 1. **Launch Risk Retirement Validation Agent**: ``` Task( subagent_type="risk-manager", description="Validate risk retirements with evidence", prompt=""" Read updated risk list: .aiwg/risks/risk-list.md Read spike results: .aiwg/risks/spike-*-results.md Read POC results: .aiwg/risks/poc-*-results.md Validate Risk Retirement Checklist: - [ ] Spike/POC completed with successful result - [ ] Evidence documented (code, tests, metrics) - [ ] ADR created if architectural change - [ ] Risk owner confirms retirement - [ ] No residual concerns from team Risk Retirement Evidence Types: 1. Technical Validation - Spike code demonstrates feasibility - Performance tests meet requirements - Integration with third-party working - Prototype operational 2. Architecture Validation - ADR documents decision - Peer review confirms approach - Security Architect approves security design - Test strategy covers risk area 3. Business Validation - Stakeholder confirms requirement clarified - Product Owner accepts scope change - Funding secured for phase - Resource availability confirmed Premature Retirement Warning Signs: - No evidence artifact (spike card, ADR) - Spike marked SUCCESS but no prototype - Risk owner changed without transfer - Status changed without team review - Assumptions not validated Generate Risk Retirement Report: 1. Newly Retired Risks - For each: Risk-ID, title, priority, retirement date, validation method, evidence, owner, confirmed by 2. Risk Retirement Statistics - Phase progress (risks retired per phase) - Retirement rate by category 3. ABM Risk Criteria (if Elaboration phase) - Show Stopper Risks: 100% retired/mitigated - High Risks: 100% retired/mitigated - All Risks: ≥70% retired/mitigated - Top 3 Inception Risks: 100% resolved - ABM Risk Gate Status: PASS | FAIL 4. Active Risks Remaining - Show Stopper: {count} - High: {count} - Medium: {count} - Low: {count} Save to: .aiwg/risks/risk-retirement-report.md """ ) ``` **Communicate Progress**: ``` ✓ Spike execution complete ⏳ Validating risk retirements... ✓ Risk Retirement Report: .aiwg/risks/risk-retirement-report.md - Risks retired this cycle: {count} - Total retirement rate: {percentage}% - ABM criteria: {PASS | FAIL | N/A} ⚠️ Premature retirements flagged: {count} ``` ### Step 6: Escalate Show Stopper Risks **Purpose**: For P0 risks that cannot be retired by the team, escalate to executive leadership **Your Actions**: 1. **Identify Show Stopper Risks Requiring Escalation**: ``` Read .aiwg/risks/risk-list.md Filter for: - Priority: Show Stopper (P0) - Status: IDENTIFIED or ESCALATE - Age: >1 iteration without resolution ``` 2. **For Each Show Stopper Risk, Create Escalation Brief**: ``` Task( subagent_type="project-manager", description="Create escalation brief for Risk #{risk-id}", prompt=""" Risk to escalate: {risk-description} Risk ID: {risk-id} Priority: Show Stopper (P0) Risk Score: {score} Escalation Triggers: - Show Stopper risk identified (score ≥21) - High risk not mitigated within 1 iteration - Risk requires budget increase (>10% over baseline) - Risk requires scope reduction (major feature cut) - Risk requires timeline extension (>2 weeks) - Risk requires external vendor decision Prepare Escalation Brief: 1. Risk Description (1-2 sentences, clear, non-technical for executive audience) 2. Impact if Not Addressed - Schedule Impact: {delay in weeks} - Budget Impact: {cost increase} - Scope Impact: {features at risk} - Quality Impact: {technical debt, defects} 3. Options for Resolution (3-5 options with pros/cons) - Option A: {approach, pros, cons, cost, timeline} - Option B: {approach, pros, cons, cost, timeline} - Option C: {approach, pros, cons, cost, timeline} 4. Recommendation - Recommended Option: {option-number} - Rationale: {why this option is best} - Dependencies: {what must happen for this option to succeed} 5. Decision Required By: {date} Template structure: - Executive summary (3-5 sentences) - Options table (comparison) - Recommendation (1 paragraph) - Decision section (to be filled by Executive Sponsor) Save to: .aiwg/risks/risk-escalation-{risk-id}.md """ ) ``` 3. **Generate Escalation Log**: ``` Task( subagent_type="project-manager", description="Maintain risk escalation log", prompt=""" Read all escalation briefs: .aiwg/risks/risk-escalation-*.md Generate Risk Escalation Log: 1. Active Escalations - For each: Risk-ID, title, escalation date, decision required by, status (PENDING | RESOLVED), decision maker 2. Resolved Escalations - For each: Risk-ID, title, escalation date, resolution date, decision, outcome 3. Escalation Metrics - Total escalations: {count} - Resolved escalations: {count} - Average resolution time: {days} - Escalations this phase: {count} Save to: .aiwg/risks/risk-escalation-log.md """ ) ``` **Communicate Progress**: ``` ✓ Risk retirement validation complete ⏳ Escalating Show Stopper risks... ⚠️ Risk #{risk-id-1}: {title} - ESCALATED (decision required by {date}) ⚠️ Risk #{risk-id-2}: {title} - ESCALATED (budget decision needed) ✓ Escalation Briefs created: .aiwg/risks/risk-escalation-*.md - Show Stopper risks escalated: {count} - Awaiting executive decision: {count} ``` ### Step 7: Generate Risk Status Report for Stakeholders **Purpose**: Create comprehensive risk report for stakeholders **Your Actions**: 1. **Launch Risk Status Report Agent**: ``` Task( subagent_type="project-manager", description="Generate stakeholder risk status report", prompt=""" Read all risk artifacts: - .aiwg/risks/risk-list.md - .aiwg/risks/risk-assessment-{date}.md - .aiwg/risks/risk-retirement-report.md - .aiwg/risks/spike-execution-summary-{date}.md - .aiwg/risks/risk-escalation-log.md Generate Risk Status Report: Report Audience: - Executive Sponsor: High-level summary, escalations, decisions needed - Product Owner: Business risks, scope impact, priority changes - Project Manager: All risks, action items, owner assignments - Development Team: Technical risks, spikes, mitigation actions Structure: 1. Executive Summary - Overall Risk Posture: LOW | MODERATE | HIGH | CRITICAL - Key Highlights (active risks, retired, new, escalations) - Top 3 Concerns (brief description of highest-priority risks) 2. Risk Summary by Priority - Show Stopper (P0): {count} - list each with impact, mitigation, owner, status - High (P1): {count} - list each with impact, mitigation, owner, status - Medium (P2): {count} - summary only - Low (P3): {count} - summary only 3. Risk Trends - Risk Velocity (new vs. retired, net change) - Risk Score Trend (average score, trend direction) - Risk Retirement Progress (percentage, target for phase) 4. Action Items - Immediate Actions Required (next 1 week) - Spikes Planned (next 2 weeks) - Escalations Required (Show Stopper risks) 5. Gate Readiness (if applicable) - Next Gate: {LOM | ABM | OCM | PRM} - Risk Criteria Status (checklist) - Gate Risk Status: ON TRACK | AT RISK | BLOCKED 6. Appendix: Detailed Risk List (all details) Save to: .aiwg/risks/risk-status-report-{date}.md """ ) ``` **Communicate Progress**: ``` ✓ Escalations processed ⏳ Generating risk status report... ✓ Risk Status Report complete: .aiwg/risks/risk-status-report-{date}.md - Overall risk posture: {LOW | MODERATE | HIGH | CRITICAL} - Top concern: {risk-id} ({priority}) - Action items: {count} ``` ## Quality Gates Before marking workflow complete, verify: - [ ] Risk identification workshop conducted with team participation - [ ] All risks assessed with probability × impact scoring - [ ] Risk list updated with current status and traceability - [ ] Spikes/POCs executed for high-priority risks (1-3 days timebox each) - [ ] Risk retirements validated with evidence artifacts - [ ] Show Stopper risks escalated with decision briefs - [ ] Risk status report generated for stakeholders - [ ] Working drafts archived (workshop notes, spike results) ## User Communication **At start**: Confirm understanding and list activities ``` Understood. I'll orchestrate the Risk Management Cycle. This will conduct: - Risk Identification Workshop (90 minutes) - Risk Assessment and Scoring - Risk List Update - Spike/POC Execution for high-priority risks - Risk Retirement Validation - Show Stopper Risk Escalation - Stakeholder Risk Status Report I'll coordinate multiple agents for comprehensive risk coverage. Expected duration: 10-15 minutes orchestration + 2-5 days for spikes. Starting orchestration... ``` **During**: Update progress with clear indicators ``` ✓ = Complete ⏳ = In progress ❌ = Error/blocked ⚠️ = Warning/attention needed ``` **At end**: Summary report with artifact locations and status ``` ───────────────────────────────────────────── Risk Management Cycle Complete ───────────────────────────────────────────── **Overall Risk Posture**: {LOW | MODERATE | HIGH | CRITICAL} **Risk Summary**: - Active Risks: {count} (P0: {count}, P1: {count}, P2: {count}, P3: {count}) - New Risks This Cycle: {count} - Retired Risks This Cycle: {count} - Escalations Required: {count} **Top 3 Risks**: 1. {Risk-ID}: {description} - {priority} (score: {score}) 2. {Risk-ID}: {description} - {priority} (score: {score}) 3. {Risk-ID}: {description} - {priority} (score: {score}) **Artifacts Generated**: - Risk Workshop Notes: .aiwg/risks/risk-workshop-{date}.md - Risk Assessment Report: .aiwg/risks/risk-assessment-{date}.md - Updated Risk List: .aiwg/risks/risk-list.md - Spike Results: .aiwg/risks/spike-*-results.md ({count} spikes) - Risk Retirement Report: .aiwg/risks/risk-retirement-report.md - Escalation Briefs: .aiwg/risks/risk-escalation-*.md ({count} escalations) - Risk Status Report: .aiwg/risks/risk-status-report-{date}.md **Next Steps**: - Review all generated artifacts - Schedule executive decision meetings for escalated risks - Assign spike/POC owners for high-priority risks - Next risk cycle: {date} (bi-weekly) - If Elaboration ABM: Risk retirement target ≥70% ({current-percentage}%) ───────────────────────────────────────────── ``` ## Error Handling **If No Risks Identified**: ``` ⚠️ Risk identification workshop produced no new risks This may indicate: - Insufficient analysis or team participation - Risk saturation (all risks already identified) - Workshop facilitation issues Recommendation: - Re-run workshop with broader team participation - Review risk identification prompts for comprehensiveness - Consider external risk assessment (third-party review) Action: Continue with existing risk tracking and monitoring. ``` **If Risk Scoring Inconsistent**: ``` ⚠️ Risk scores vary widely across team members Examples: - Risk #{risk-id}: Probability estimates range 1-5 - Risk #{risk-id}: Impact estimates range 2-5 Recommendation: - Calibrate scoring criteria using risk matrix examples - Project Manager facilitates consensus scoring - Use planning poker technique for score alignment - Document scoring rationale for future consistency Action: Escalating to Project Manager for score calibration. ``` **If Spike Overrunning Timebox**: ``` ❌ Spike {Spike-ID} exceeding {timebox} days Risk: {risk-description} Planned duration: {timebox} days Actual duration: {actual} days (ongoing) Impact: - Spike time overruns indicate risk underestimated - Resource allocation affected - Risk retirement delayed Action: - Stop spike immediately - Document findings to date - Re-assess risk score (likely higher than initially estimated) - Consider alternative mitigation approach or escalation Escalating to user for decision... ``` **If Risk Retirement Without Evidence**: ``` ❌ Risk {Risk-ID} marked RETIRED without evidence artifact Risk: {risk-description} Status: RETIRED Evidence: MISSING (no spike card, ADR, or validation document) Impact: - Cannot validate risk retirement for gate criteria - Risk may re-emerge later in project - Audit trail incomplete Action: - Request evidence artifact from risk owner - If no evidence, revert status to IDENTIFIED or MITIGATED - Schedule spike/POC to properly validate risk retirement Cannot proceed with gate validation until evidence provided. ``` **If Show Stopper Risk Not Escalated**: ``` ❌ Risk {Risk-ID} is Show Stopper (P0) but not escalated Risk: {risk-description} Priority: Show Stopper (P0) Score: {score} (≥21) Status: IDENTIFIED Age: {days} days Impact: - Project cannot proceed without resolution - Critical path blocked - Executive decision required Action: - Prepare escalation brief immediately - Contact Executive Sponsor within 24 hours - Provide 3-5 resolution options with pros/cons - Schedule emergency escalation meeting Escalating to user for immediate action... ``` **If Risk Retirement Insufficient for Gate**: ``` ⚠️ Risk retirement {percentage}% (target: ≥70% for ABM) Outstanding risks: - Show Stopper: {count} (must be 0) - High: {count} (must be 0) - Medium: {count} - Low: {count} Gap analysis: - Need to retire {count} more risks to meet ABM criteria - Estimated time: {weeks} weeks of additional spikes/POCs Recommendation: - Conduct additional spikes/POCs to retire critical risks - Focus on P0 and P1 risks first (gate blockers) - Consider risk acceptance for low-impact Medium risks (with sponsor approval) Impact: - ABM may result in CONDITIONAL GO or NO-GO if risk retirement remains insufficient - Construction phase delayed until risk criteria met Action: Review risk list with Executive Sponsor for prioritization decision. ``` ## Success Criteria This orchestration succeeds when: - [ ] Risk identification workshop conducted with team participation - [ ] All risks assessed with probability × impact scoring - [ ] Risk list template updated with current status and traceability - [ ] Spikes/POCs executed for high-priority risks (within timebox) - [ ] Risk retirements validated with evidence artifacts - [ ] Show Stopper risks escalated to executive leadership with decision briefs - [ ] Risk status report generated for stakeholders - [ ] Complete audit trails archived (workshop notes, spike results, escalation briefs) - [ ] Risk retirement metrics tracked (rate, velocity, time to retirement) ## Metrics to Track **During orchestration, track**: - Risk retirement rate: {percentage}% per phase - Risk velocity: New risks vs retired risks per iteration - Average risk score: Trend over time (target: decreasing) - Time to retirement: Days from identification to retirement - Spike success rate: {percentage}% of spikes retire risks - Escalation rate: {count} escalations per phase **Target Metrics by Phase**: - **Inception**: 5-10 risks identified, 0% retired (baseline) - **Elaboration**: 10-20 risks identified, 70%+ retired by ABM - **Construction**: 5-10 new risks per iteration, 90%+ retired by OCM - **Transition**: 3-5 operational risks, 95%+ retired by PRM ## References **Templates** (via $AIWG_ROOT): - Risk List: `templates/management/risk-list-template.md` - Spike Card: `templates/analysis-design/spike-card-template.md` - Architecture Decision Record: `templates/analysis-design/architecture-decision-record-template.md` **Gate Criteria**: - `flows/gate-criteria-by-phase.md` (risk criteria per phase) **Multi-Agent Pattern**: - `docs/multi-agent-documentation-pattern.md` **Orchestrator Architecture**: - `docs/orchestrator-architecture.md`