# Project Scope Template ## Document Control | Field | Value | |-------|-------| | **Template Version** | 1.0.0 | | **Last Updated** | 2025-01-28 | | **Owner** | Project Manager | | **Status** | DRAFT | | **Project ID** | [Auto-generated or manual] | --- ## YAML Frontmatter ```yaml project: id: "[PROJECT-ID]" name: "[Project Name]" type: "[Campaign | Content Series | Product Launch | Rebranding | Event | Other]" status: "SCOPING" governance: submitted_by: "[Name]" submission_date: "[YYYY-MM-DD]" approved_by: "[Name]" approval_date: "[YYYY-MM-DD]" last_updated: "[YYYY-MM-DD]" timeline: project_start: "[YYYY-MM-DD]" project_end: "[YYYY-MM-DD]" duration_weeks: "[Number]" phase: "[Planning | Execution | Review | Complete]" budget: total_budget: "[Amount]" budget_status: "[Approved | Pending | Estimated]" ``` --- ## 1. Project Overview ### 1.1 Project Identification **Project Name**: [Official project name] **Project Code/ID**: [Internal tracking code if applicable] **Project Type**: [Select primary type] - [ ] Marketing Campaign - [ ] Content Program/Series - [ ] Product Launch - [ ] Brand Refresh/Rebranding - [ ] Event (Virtual/Physical) - [ ] Website Redesign - [ ] Sales Enablement - [ ] Customer Engagement Program - [ ] Other: [Specify] **Project Duration**: [Start date] to [End date] ([X] weeks/months) ### 1.2 Project Purpose **Executive Summary**: [2-3 sentence project overview] ```text [Concise summary of what this project is and why it exists] ``` **Business Objective**: [What business goal does this project support?] ```text [Describe the business context - revenue target, market position, competitive response, customer retention, brand awareness, etc.] ``` **Success Definition**: [What does success look like?] ```text [Describe the outcomes that would make this project successful - specific, measurable, and aligned with business objectives] ``` ### 1.3 Project Background **Context**: [Why is this project happening now?] ```text [Provide background - market changes, competitive pressure, strategic initiative, customer feedback, product roadmap, seasonal opportunity, etc.] ``` **Relationship to Other Initiatives**: [How does this fit with other work?] - **Related Projects**: [List any connected projects] - **Integration Points**: [Where this project intersects with others] - **Potential Conflicts**: [Any resource or timing conflicts to manage] --- ## 2. Scope Definition ### 2.1 In-Scope Deliverables **Deliverable Category 1: [Category Name]** | Deliverable | Description | Format | Owner | Due Date | |-------------|-------------|--------|-------|----------| | [Item 1] | [Brief description] | [Format/specs] | [Name] | [YYYY-MM-DD] | | [Item 2] | [Brief description] | [Format/specs] | [Name] | [YYYY-MM-DD] | | [Item 3] | [Brief description] | [Format/specs] | [Name] | [YYYY-MM-DD] | **Deliverable Category 2: [Category Name]** | Deliverable | Description | Format | Owner | Due Date | |-------------|-------------|--------|-------|----------| | [Item 1] | [Brief description] | [Format/specs] | [Name] | [YYYY-MM-DD] | | [Item 2] | [Brief description] | [Format/specs] | [Name] | [YYYY-MM-DD] | | [Item 3] | [Brief description] | [Format/specs] | [Name] | [YYYY-MM-DD] | **Deliverable Category 3: [Category Name]** | Deliverable | Description | Format | Owner | Due Date | |-------------|-------------|--------|-------|----------| | [Item 1] | [Brief description] | [Format/specs] | [Name] | [YYYY-MM-DD] | | [Item 2] | [Brief description] | [Format/specs] | [Name] | [YYYY-MM-DD] | | [Item 3] | [Brief description] | [Format/specs] | [Name] | [YYYY-MM-DD] | **Total Deliverables**: [X] deliverables across [Y] categories ### 2.2 Out-of-Scope Items **Explicitly Excluded**: [What this project will NOT include] - [ ] [Out-of-scope item 1] - [Reason for exclusion] - [ ] [Out-of-scope item 2] - [Reason for exclusion] - [ ] [Out-of-scope item 3] - [Reason for exclusion] - [ ] [Out-of-scope item 4] - [Reason for exclusion] **Future Consideration**: [Items deferred to future projects] - [Item 1] - [Why deferred, when to revisit] - [Item 2] - [Why deferred, when to revisit] ### 2.3 Scope Boundaries **Geographic Scope**: [Which markets/regions?] - [ ] Global - [ ] North America - [ ] EMEA - [ ] APAC - [ ] LATAM - [ ] Specific Countries: [List] **Audience Scope**: [Which audience segments?] - [Segment 1] - [Priority: High/Medium/Low] - [Segment 2] - [Priority: High/Medium/Low] - [Segment 3] - [Priority: High/Medium/Low] **Channel Scope**: [Which channels are in-scope?] - [ ] Website - [ ] Email - [ ] Social Media (specify platforms) - [ ] Paid Advertising (specify channels) - [ ] Events - [ ] Print - [ ] Broadcast - [ ] Other: [Specify] **Language Scope**: [Which languages?] - [Language 1] - [Primary/Secondary] - [Language 2] - [Primary/Secondary] - [Language 3] - [Primary/Secondary] --- ## 3. Timeline and Milestones ### 3.1 Project Phases **Phase 1: [Phase Name]** [Start Date] - [End Date] ([X] weeks) **Objectives**: [What this phase accomplishes] **Key Milestones**: - [ ] [Milestone 1] - [Due: YYYY-MM-DD] - [ ] [Milestone 2] - [Due: YYYY-MM-DD] - [ ] [Milestone 3] - [Due: YYYY-MM-DD] **Phase Completion Criteria**: [What must be done to exit this phase] --- **Phase 2: [Phase Name]** [Start Date] - [End Date] ([X] weeks) **Objectives**: [What this phase accomplishes] **Key Milestones**: - [ ] [Milestone 1] - [Due: YYYY-MM-DD] - [ ] [Milestone 2] - [Due: YYYY-MM-DD] - [ ] [Milestone 3] - [Due: YYYY-MM-DD] **Phase Completion Criteria**: [What must be done to exit this phase] --- **Phase 3: [Phase Name]** [Start Date] - [End Date] ([X] weeks) **Objectives**: [What this phase accomplishes] **Key Milestones**: - [ ] [Milestone 1] - [Due: YYYY-MM-DD] - [ ] [Milestone 2] - [Due: YYYY-MM-DD] - [ ] [Milestone 3] - [Due: YYYY-MM-DD] **Phase Completion Criteria**: [What must be done to exit this phase] --- **Phase 4: [Phase Name]** [Start Date] - [End Date] ([X] weeks) **Objectives**: [What this phase accomplishes] **Key Milestones**: - [ ] [Milestone 1] - [Due: YYYY-MM-DD] - [ ] [Milestone 2] - [Due: YYYY-MM-DD] - [ ] [Milestone 3] - [Due: YYYY-MM-DD] **Phase Completion Criteria**: [What must be done to exit this phase] --- ### 3.2 Critical Path **Critical Milestones**: [Milestones that cannot slip without impacting project] | Milestone | Date | Dependencies | Impact if Delayed | |-----------|------|--------------|-------------------| | [Milestone 1] | [YYYY-MM-DD] | [What must happen first] | [Consequence of delay] | | [Milestone 2] | [YYYY-MM-DD] | [What must happen first] | [Consequence of delay] | | [Milestone 3] | [YYYY-MM-DD] | [What must happen first] | [Consequence of delay] | | [Milestone 4] | [YYYY-MM-DD] | [What must happen first] | [Consequence of delay] | **Critical Path Risks**: [Risks to the critical path] - [Risk 1] - [Likelihood: High/Med/Low] - [Mitigation] - [Risk 2] - [Likelihood: High/Med/Low] - [Mitigation] ### 3.3 Timeline Flexibility **Fixed Dates**: [Dates that cannot move] - **[Milestone/Date]**: [Why it's fixed - event, product launch, fiscal period, etc.] - **[Milestone/Date]**: [Why it's fixed] **Flexible Dates**: [Dates that can be adjusted if needed] - **[Milestone/Date]**: [Flexibility window - e.g., ±1 week] - **[Milestone/Date]**: [Flexibility window] **Schedule Buffer**: [Where buffer exists in schedule] ```text [Describe where schedule contingency is built in and how much slack exists for unexpected delays] ``` --- ## 4. Resource Requirements ### 4.1 Team Structure **Project Leadership**: | Role | Name | Allocation | Responsibility | |------|------|------------|----------------| | Project Manager | [Name] | [% or hours/week] | [Overall coordination, timeline, budget] | | Project Sponsor | [Name] | [% or hours/week] | [Stakeholder management, approvals, escalation] | **Core Team**: | Role | Name | Allocation | Responsibility | |------|------|------------|----------------| | [Role] | [Name] | [% or hours/week] | [Key responsibilities] | | [Role] | [Name] | [% or hours/week] | [Key responsibilities] | | [Role] | [Name] | [% or hours/week] | [Key responsibilities] | | [Role] | [Name] | [% or hours/week] | [Key responsibilities] | | [Role] | [Name] | [% or hours/week] | [Key responsibilities] | **Extended Team**: | Role | Name | Allocation | Responsibility | |------|------|------------|----------------| | [Role] | [Name] | [% or hours/week] | [Key responsibilities] | | [Role] | [Name] | [% or hours/week] | [Key responsibilities] | | [Role] | [Name] | [% or hours/week] | [Key responsibilities] | **Subject Matter Experts**: | Expert | Area of Expertise | When Needed | Availability | |--------|------------------|-------------|--------------| | [Name] | [Expertise] | [Phase/milestone] | [Available/TBD/Limited] | | [Name] | [Expertise] | [Phase/milestone] | [Available/TBD/Limited] | ### 4.2 External Resources **Agencies and Vendors**: | Partner | Service | Scope | Budget | Contact | |---------|---------|-------|--------|---------| | [Agency/Vendor] | [Creative, Media, Tech, etc.] | [What they're doing] | $[Amount] | [Name, email] | | [Agency/Vendor] | [Creative, Media, Tech, etc.] | [What they're doing] | $[Amount] | [Name, email] | | [Agency/Vendor] | [Creative, Media, Tech, etc.] | [What they're doing] | $[Amount] | [Name, email] | **Vendor Management**: - **Contracts**: [Status - In place, pending, TBD] - **SOWs**: [Statement of Work status] - **Kickoff Date**: [When vendors onboard] **Freelancers/Contractors**: | Resource | Skill | Duration | Rate | Availability | |----------|-------|----------|------|--------------| | [Name/TBD] | [Copywriter, Designer, etc.] | [Hours/weeks] | $[Rate] | [Confirmed/TBD] | | [Name/TBD] | [Copywriter, Designer, etc.] | [Hours/weeks] | $[Rate] | [Confirmed/TBD] | ### 4.3 Technology and Tools **Required Platforms**: | Platform | Purpose | Owner | Status | Cost | |----------|---------|-------|--------|------| | [Tool/Platform] | [What it's used for] | [Admin/owner] | [Active/Setup needed/Procurement needed] | $[Cost if applicable] | | [Tool/Platform] | [What it's used for] | [Admin/owner] | [Active/Setup needed/Procurement needed] | $[Cost if applicable] | | [Tool/Platform] | [What it's used for] | [Admin/owner] | [Active/Setup needed/Procurement needed] | $[Cost if applicable] | **New Tool Procurement**: [Any tools that need to be purchased/set up] - [Tool name] - [Purpose] - [Budget: $X] - [Approval status] - [Tool name] - [Purpose] - [Budget: $X] - [Approval status] **Access and Permissions**: [Who needs access to what] ```text [Document any access requirements, account setup, training needs, etc.] ``` --- ## 5. Budget ### 5.1 Budget Summary **Total Project Budget**: $[Amount] **Budget Status**: [Approved | Pending Approval | Estimated] **Budget Owner**: [Name and role] **Budget Tracking**: [How budget will be tracked - tool, frequency, etc.] ### 5.2 Budget Breakdown | Category | Budget Allocated | Actual Spend (to date) | Remaining | % of Total | |----------|-----------------|------------------------|-----------|------------| | **Personnel** | | | | | | Internal Labor | $[Amount] | $[Amount] | $[Amount] | [%] | | Freelance/Contractors | $[Amount] | $[Amount] | $[Amount] | [%] | | **External Services** | | | | | | Agency Fees | $[Amount] | $[Amount] | $[Amount] | [%] | | Production Services | $[Amount] | $[Amount] | $[Amount] | [%] | | **Media and Distribution** | | | | | | Paid Media | $[Amount] | $[Amount] | $[Amount] | [%] | | Event Costs | $[Amount] | $[Amount] | $[Amount] | [%] | | **Technology** | | | | | | Software/Tools | $[Amount] | $[Amount] | $[Amount] | [%] | | Platform Fees | $[Amount] | $[Amount] | $[Amount] | [%] | | **Content Production** | | | | | | Video Production | $[Amount] | $[Amount] | $[Amount] | [%] | | Photography | $[Amount] | $[Amount] | $[Amount] | [%] | | Copywriting | $[Amount] | $[Amount] | $[Amount] | [%] | | Design/Creative | $[Amount] | $[Amount] | $[Amount] | [%] | | **Other** | | | | | | Research | $[Amount] | $[Amount] | $[Amount] | [%] | | Legal/Compliance | $[Amount] | $[Amount] | $[Amount] | [%] | | Miscellaneous | $[Amount] | $[Amount] | $[Amount] | [%] | | **Contingency** | | | | | | Reserve (10-20%) | $[Amount] | $[Amount] | $[Amount] | [%] | | **TOTAL** | **$[Amount]** | **$[Amount]** | **$[Amount]** | **100%** | ### 5.3 Budget Governance **Approval Thresholds**: - **Under $[Amount]**: [Who can approve] - **$[Amount] - $[Amount]**: [Who can approve] - **Over $[Amount]**: [Who can approve] **Change Request Process**: [How budget changes are requested and approved] ```text [Describe the process for requesting budget increases, reallocations, or other changes] ``` **Budget Risk**: [Known budget uncertainties] - [Risk 1] - [Potential impact: $X] - [Mitigation] - [Risk 2] - [Potential impact: $X] - [Mitigation] --- ## 6. Dependencies ### 6.1 Internal Dependencies **Dependent on Other Projects**: | Dependency | Project/Team | What We Need | By When | Status | Risk | |------------|--------------|--------------|---------|--------|------| | [Dependency] | [Project/Team name] | [Specific input/deliverable] | [YYYY-MM-DD] | [On track/At risk/Blocked] | [High/Med/Low] | | [Dependency] | [Project/Team name] | [Specific input/deliverable] | [YYYY-MM-DD] | [On track/At risk/Blocked] | [High/Med/Low] | | [Dependency] | [Project/Team name] | [Specific input/deliverable] | [YYYY-MM-DD] | [On track/At risk/Blocked] | [High/Med/Low] | **Other Projects Dependent on Us**: | Project | What They Need from Us | By When | Owner | Status | |---------|------------------------|---------|-------|--------| | [Project name] | [Deliverable/input] | [YYYY-MM-DD] | [Name] | [On track/At risk] | | [Project name] | [Deliverable/input] | [YYYY-MM-DD] | [Name] | [On track/At risk] | ### 6.2 External Dependencies **Third-Party Dependencies**: | Dependency | Provider | What We Need | By When | Status | Mitigation | |------------|----------|--------------|---------|--------|------------| | [Item] | [Company/person] | [Deliverable/action] | [YYYY-MM-DD] | [Status] | [Backup plan] | | [Item] | [Company/person] | [Deliverable/action] | [YYYY-MM-DD] | [Status] | [Backup plan] | | [Item] | [Company/person] | [Deliverable/action] | [YYYY-MM-DD] | [Status] | [Backup plan] | **Product/Technology Dependencies**: - **[Product/Platform]**: [What needs to happen - launch, feature release, integration, etc.] by [Date] - **[Product/Platform]**: [What needs to happen] by [Date] **Event/Market Dependencies**: - **[Event/Market Factor]**: [How this impacts project - seasonality, conference, product launch, etc.] - **[Event/Market Factor]**: [How this impacts project] ### 6.3 Decision Dependencies **Decisions Required**: | Decision | Decision Maker | Needed By | Current Status | Impact if Delayed | |----------|---------------|-----------|----------------|-------------------| | [Decision topic] | [Name/Role] | [YYYY-MM-DD] | [Pending/Scheduled/Made] | [Impact description] | | [Decision topic] | [Name/Role] | [YYYY-MM-DD] | [Pending/Scheduled/Made] | [Impact description] | | [Decision topic] | [Name/Role] | [YYYY-MM-DD] | [Pending/Scheduled/Made] | [Impact description] | --- ## 7. Constraints and Assumptions ### 7.1 Constraints **Budget Constraints**: ```text [Describe any budget limitations, caps, or restrictions] ``` **Timeline Constraints**: ```text [Describe any hard deadlines, seasonal windows, or time limitations] ``` **Resource Constraints**: ```text [Describe any limitations on people, tools, or capabilities] ``` **Technical Constraints**: ```text [Describe any technology limitations, platform restrictions, or integration challenges] ``` **Legal/Regulatory Constraints**: ```text [Describe any compliance requirements, legal restrictions, or regulatory approvals needed] ``` **Geographic/Market Constraints**: ```text [Describe any regional limitations, market restrictions, or localization requirements] ``` ### 7.2 Assumptions **Project Assumptions**: [What we're assuming to be true] - [ ] [Assumption 1] - [Impact if assumption is false] - [ ] [Assumption 2] - [Impact if assumption is false] - [ ] [Assumption 3] - [Impact if assumption is false] - [ ] [Assumption 4] - [Impact if assumption is false] - [ ] [Assumption 5] - [Impact if assumption is false] **Validation Plan**: [How we'll validate critical assumptions] ```text [Describe how and when key assumptions will be validated or tested] ``` --- ## 8. Risks and Mitigation ### 8.1 Risk Register | Risk | Impact | Probability | Score | Mitigation Strategy | Owner | |------|--------|-------------|-------|---------------------|-------| | [Risk description] | [H/M/L] | [H/M/L] | [1-9] | [How we'll prevent/respond] | [Name] | | [Risk description] | [H/M/L] | [H/M/L] | [1-9] | [How we'll prevent/respond] | [Name] | | [Risk description] | [H/M/L] | [H/M/L] | [1-9] | [How we'll prevent/respond] | [Name] | | [Risk description] | [H/M/L] | [H/M/L] | [1-9] | [How we'll prevent/respond] | [Name] | | [Risk description] | [H/M/L] | [H/M/L] | [1-9] | [How we'll prevent/respond] | [Name] | **Risk Scoring**: [Impact × Probability] - High (H) = 3 - Medium (M) = 2 - Low (L) = 1 - Score 6-9 = Critical risk requiring active mitigation - Score 3-4 = Monitor and prepare contingency - Score 1-2 = Accept and monitor ### 8.2 Top Risks Deep Dive **Risk 1: [Risk Name]** - **Description**: [Detailed description of the risk] - **Trigger**: [What would indicate this risk is materializing] - **Impact**: [Consequences if this risk occurs] - **Mitigation**: [Steps to prevent or minimize] - **Contingency**: [Backup plan if risk occurs] - **Owner**: [Who is responsible for monitoring/mitigating] **Risk 2: [Risk Name]** - **Description**: [Detailed description of the risk] - **Trigger**: [What would indicate this risk is materializing] - **Impact**: [Consequences if this risk occurs] - **Mitigation**: [Steps to prevent or minimize] - **Contingency**: [Backup plan if risk occurs] - **Owner**: [Who is responsible for monitoring/mitigating] **Risk 3: [Risk Name]** - **Description**: [Detailed description of the risk] - **Trigger**: [What would indicate this risk is materializing] - **Impact**: [Consequences if this risk occurs] - **Mitigation**: [Steps to prevent or minimize] - **Contingency**: [Backup plan if risk occurs] - **Owner**: [Who is responsible for monitoring/mitigating] --- ## 9. Quality and Success Criteria ### 9.1 Quality Standards **Deliverable Quality Criteria**: | Deliverable Type | Quality Standard | Review Process | Acceptance Criteria | |-----------------|------------------|----------------|---------------------| | [Type] | [Standard to meet] | [Who reviews, how] | [What "done" looks like] | | [Type] | [Standard to meet] | [Who reviews, how] | [What "done" looks like] | | [Type] | [Standard to meet] | [Who reviews, how] | [What "done" looks like] | **Brand Compliance**: [How brand standards will be enforced] **Legal/Regulatory Compliance**: [How compliance will be validated] **Accessibility Standards**: [WCAG level, other standards] ### 9.2 Success Metrics **Project Success Metrics**: [How we'll measure project delivery success] | Metric | Target | How Measured | Measurement Date | |--------|--------|--------------|------------------| | On-Time Delivery | [100% of milestones met] | [Project tracking] | [Project end] | | On-Budget Delivery | [<5% variance] | [Budget tracking] | [Project end] | | Quality Score | [>90% pass first review] | [QA tracking] | [Ongoing] | | Stakeholder Satisfaction | [>4.0/5.0] | [Survey] | [Project end] | **Business Impact Metrics**: [How we'll measure business success] | Metric | Baseline | Target | How Measured | When Measured | |--------|----------|--------|--------------|---------------| | [Business metric] | [Current state] | [Goal] | [Method] | [Timeframe] | | [Business metric] | [Current state] | [Goal] | [Method] | [Timeframe] | | [Business metric] | [Current state] | [Goal] | [Method] | [Timeframe] | ### 9.3 Definition of Done **Project Completion Criteria**: - [ ] All in-scope deliverables completed and approved - [ ] All quality standards met - [ ] All stakeholder approvals obtained - [ ] Documentation complete and archived - [ ] Post-project review conducted - [ ] Lessons learned documented - [ ] Budget reconciled and closed - [ ] [Other criteria specific to this project] --- ## 10. Governance and Communication ### 10.1 Stakeholder Management **Key Stakeholders**: | Name | Role | Interest Level | Influence Level | Communication Preference | |------|------|----------------|-----------------|-------------------------| | [Name] | [Role] | [High/Med/Low] | [High/Med/Low] | [Email/Meeting/Dashboard] | | [Name] | [Role] | [High/Med/Low] | [High/Med/Low] | [Email/Meeting/Dashboard] | | [Name] | [Role] | [High/Med/Low] | [High/Med/Low] | [Email/Meeting/Dashboard] | | [Name] | [Role] | [High/Med/Low] | [High/Med/Low] | [Email/Meeting/Dashboard] | **Stakeholder Engagement Plan**: - **High Interest, High Influence**: [Manage closely - frequent updates, proactive engagement] - **High Interest, Low Influence**: [Keep informed - regular updates, solicit input] - **Low Interest, High Influence**: [Keep satisfied - key milestone updates, approval loops] - **Low Interest, Low Influence**: [Monitor - high-level updates as needed] ### 10.2 Communication Plan **Regular Communications**: | Communication | Audience | Frequency | Format | Owner | |---------------|----------|-----------|--------|-------| | Project Status Update | [Stakeholders] | [Weekly/Bi-weekly] | [Email/Dashboard] | [PM] | | Team Stand-up | [Core Team] | [Daily/Weekly] | [Meeting/Slack] | [PM] | | Stakeholder Review | [Leadership] | [Monthly] | [Presentation] | [Sponsor] | | Executive Summary | [Executives] | [Monthly] | [Email] | [PM] | **Ad-Hoc Communications**: - **Issue Escalation**: [When and how issues are escalated] - **Change Requests**: [How changes are communicated and approved] - **Risk Alerts**: [How risks are flagged and discussed] ### 10.3 Decision-Making Process **Decision Authority**: | Decision Type | Authority | Consultation Required | Escalation Path | |---------------|-----------|----------------------|-----------------| | Day-to-day tactical | [PM] | [Core team] | [Sponsor] | | Budget <$[X] | [PM] | [Finance] | [Sponsor] | | Budget >$[X] | [Sponsor] | [PM, Finance] | [Executive] | | Scope changes | [Sponsor] | [PM, stakeholders] | [Executive] | | Timeline changes | [Sponsor] | [PM, stakeholders] | [Executive] | **Meeting Cadence**: - **Core Team Sync**: [Frequency] - [Day/time] - **Stakeholder Check-in**: [Frequency] - [Day/time] - **Executive Review**: [Frequency] - [Day/time] --- ## 11. Change Management ### 11.1 Scope Change Process **Change Request Procedure**: 1. [Step 1: Change requested via form/email] 2. [Step 2: PM evaluates impact on timeline, budget, resources] 3. [Step 3: Recommendation presented to sponsor/stakeholders] 4. [Step 4: Decision made and documented] 5. [Step 5: Project plan and docs updated] **Change Request Template**: [Link or location] **Change Log**: [Where changes are tracked] ### 11.2 Issue Management **Issue Tracking**: [Tool/process for logging issues] **Issue Escalation Criteria**: - **Critical**: [Definition - e.g., project-blocking, timeline impact >1 week] - **High**: [Definition - e.g., significant impact, workaround available] - **Medium**: [Definition - e.g., minor impact, manageable] - **Low**: [Definition - e.g., cosmetic, future consideration] **Issue Resolution SLA**: - Critical: [Response time] - High: [Response time] - Medium: [Response time] - Low: [Response time] --- ## 12. Post-Project Activities ### 12.1 Project Closure **Closure Activities**: - [ ] Final deliverables approved and delivered - [ ] Budget reconciled and closed - [ ] Vendor contracts completed and invoices paid - [ ] Project documentation archived - [ ] Team debriefed and released - [ ] Post-project review conducted - [ ] Lessons learned documented - [ ] Success metrics final measurement - [ ] Stakeholder final communication ### 12.2 Knowledge Transfer **Documentation Handoff**: - **To**: [Team/person receiving ownership] - **What**: [Assets, accounts, processes, etc.] - **When**: [Handoff date] - **Training**: [Any training or onboarding required] **Ongoing Ownership**: [Who owns project outcomes post-launch] ### 12.3 Lessons Learned **Post-Project Review**: [Scheduled date and attendees] **Lessons Learned Categories**: - **What Went Well**: [To repeat in future projects] - **What Could Improve**: [To adjust in future projects] - **Surprises**: [Unexpected challenges or opportunities] - **Recommendations**: [Changes to process, tools, or approach] **Documentation**: [Where lessons learned will be stored for future reference] --- ## Appendices ### Appendix A: Detailed Deliverable Specifications [Attach detailed specifications for complex deliverables] ### Appendix B: Related Documents - **Campaign Brief**: [Link or location] - **Brand Guidelines**: [Link or location] - **Audience Profiles**: [Link or location] - **Budget Spreadsheet**: [Link or location] - **Project Plan (Gantt)**: [Link or location] ### Appendix C: Templates and Resources - **Status Report Template**: [Link] - **Change Request Form**: [Link] - **Issue Log**: [Link] - **Risk Register**: [Link] --- ## Agent Notes ### For Project Manager - **Scope Precision**: Ensure scope is specific enough to manage but flexible enough to adapt - **Dependency Mapping**: Identify all dependencies early and track status rigorously - **Risk Proactivity**: Focus on top 3-5 risks with active mitigation, not just monitoring - **Communication Cadence**: Establish clear, consistent communication rhythms from day 1 ### For Intake Coordinator - **Completeness Verification**: Confirm all sections are filled with actionable detail - **Stakeholder Alignment**: Validate that all key stakeholders are identified and engaged - **Approval Path**: Ensure approval process is clear and all approvers are available - **Dependency Flags**: Surface any dependencies that could derail timeline early ### For Resource Manager - **Capacity Planning**: Verify resource allocations are realistic given team capacity - **Skill Matching**: Ensure people assigned have the skills for their responsibilities - **Contention Management**: Flag any resource conflicts with other projects - **Vendor Readiness**: Confirm external resources are contracted and ready to engage ### For Finance/Budget Owner - **Budget Adequacy**: Validate budget is sufficient for stated scope - **Category Allocation**: Ensure budget breakdown aligns with deliverables and timeline - **Tracking Setup**: Confirm budget tracking process is in place before spend starts - **Contingency Appropriateness**: Verify contingency % is appropriate for project risk ### For Campaign Strategist - **Strategic Alignment**: Ensure project scope supports campaign objectives - **Deliverable Relevance**: Confirm deliverables map to audience and channel strategy - **Timeline Realism**: Validate timeline allows for quality creative and approvals - **Integration Opportunities**: Identify ways to amplify impact through integration --- ## Template Version History | Version | Date | Author | Changes | |---------|------|--------|---------| | 1.0.0 | 2025-01-28 | MMK Framework Team | Initial template creation | --- **END OF TEMPLATE**