@stdlib/ndarray-base-unary-loop-interchange-order
Version:
Reorder ndarray dimensions and associated strides for loop interchange.
90 lines (76 loc) • 2.23 kB
JavaScript
/**
* @license Apache-2.0
*
* Copyright (c) 2022 The Stdlib Authors.
*
* Licensed under the Apache License, Version 2.0 (the "License");
* you may not use this file except in compliance with the License.
* You may obtain a copy of the License at
*
* http://www.apache.org/licenses/LICENSE-2.0
*
* Unless required by applicable law or agreed to in writing, software
* distributed under the License is distributed on an "AS IS" BASIS,
* WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
* See the License for the specific language governing permissions and
* limitations under the License.
*/
;
// MODULES //
var zeroTo = require( '@stdlib/array-base-zero-to' );
var copy = require( '@stdlib/array-base-copy-indexed' );
var take = require( '@stdlib/array-base-take-indexed' );
var sort2ins = require( './sort2ins.js' );
// MAIN //
/**
* Reorders ndarray dimensions and associated strides for loop interchange.
*
* ## Notes
*
* - The returned object has the following properties:
*
* - **sh**: dimensions sorted in loop order.
* - **sx**: input ndarray strides sorted in loop order.
* - **sy**: output ndarray strides sorted in loop order.
*
* @param {NonNegativeIntegerArray} sh - array dimensions
* @param {IntegerArray} sx - input array stride lengths
* @param {IntegerArray} sy - output array stride lengths
* @returns {Object} loop interchange data
*
* @example
* var sh = [ 2, 3, 4 ];
*
* var sx = [ 12, 4, 1 ]; // row-major
* var sy = [ 1, -2, 6 ]; // column-major
*
* var o = loopOrder( sh, sx, sy );
* // returns {...}
*
* var ssh = o.sh;
* // returns [ 4, 3, 2 ]
*
* var ssx = o.sx;
* // returns [ 1, 4, 12 ]
*
* var ssy = o.sy;
* // returns [ 6, -2, 1 ]
*/
function loopOrder( sh, sx, sy ) {
var idx;
// Initialize a loop interchange index array for generating a loop order permutation:
idx = zeroTo( sh.length );
// Sort the input array strides in increasing order (of magnitude):
sx = copy( sx );
sort2ins( sx, idx );
// Permute the shape and output array strides based on the sorted input array strides:
sh = take( sh, idx );
sy = take( sy, idx );
return {
'sh': sh,
'sx': sx,
'sy': sy
};
}
// EXPORTS //
module.exports = loopOrder;