UNPKG

@etm-professional-control/winccoa-mcp-server

Version:

MCP Server for WinCC OA with field-specific configurations

46 lines (37 loc) 1.92 kB
# Oil & Gas Industry Instructions ## Overview This configuration applies to WinCC OA systems used in Oil & Gas production, refining, and distribution facilities. ## Safety Requirements - **CRITICAL**: Never modify safety-critical datapoints without explicit authorization - All changes to production systems require validation and confirmation - Emergency shutdown systems are strictly read-only - Interlock conditions must be verified before any process modifications ## Operational Limits - **Flow rates**: 0-1000 m³/h (validate against pipe capacity) - **Pressure**: Maximum 100 bar (safety valve at 110 bar) - **Temperature**: -20°C to +80°C operational range - **Valve positions**: 0-100% (check for intermediate restrictions) ## Process Control Rules 1. **Before changing flow rates**: - Verify upstream and downstream pressures - Check valve positions in the flow path - Confirm tank levels are within limits 2. **Recipe Management**: - Recipe percentages represent VALVE POSITIONS, not volume percentages - Material consumption = (valve_position/100) × flow_rate × time - Always validate total consumption against target volume 3. **Cascade Control**: - Changes to master controllers affect all slaves - Verify slave controller limits before modifying master setpoints ## Alarm Management - Critical alarms (Priority 1-2) require immediate operator attention - Do not suppress alarms without proper authorization - Alarm limits should only be modified through approved change management ## Integration Points - OPC UA nodes under `ns=2;s=Production/*` are production critical - Modbus registers 40001-40100 contain safety interlocks - SQL historian updates every 10 seconds for trending data ## Compliance Notes - All changes are logged for regulatory compliance - Maintain audit trail for production setpoint modifications - Environmental limits must be respected at all times